Data Ruangan Perguruan Tinggi Institut Teknologi Sains dan Kesehatan PKU Muhammadiyah Surakarta
No | Posisi Ruang | Kode Ruang | Nama Ruang | Peruntukan | Luas | Asal Perolehan | Tahun Perolehan |
1 | Gedung A | A1.1 | Ruang REKTOR | REKTOR | 60 | D | 2020 |
2 | Gedung A | A1.2 A | Ruang Wakil Rektor | Wakil Rektor 1 | 15 | D | 2020 |
3 | Gedung A | A1.2 B | Ruang Wakil Rektor | Wakil Rektor 3 | 15 | D | 2020 |
4 | Gedung A | A1.2 C | Ruang Wakil Rektor | Wakil Rektor 2 | 15 | D | 2020 |
5 | Gedung A | A2.1 | Ruang Kuliah | Kuliah | 60 | D | 2020 |
6 | Gedung A | A2.2 | Ruang Kuliah | Kuliah | 60 | D | 2020 |
7 | Gedung A | A2.3 | Ruang Kuliah | Kuliah | 60 | D | 2020 |
8 | Gedung A | A2.4 | Ruang Transit | Transit dosen | 13 | D | 2020 |
9 | Gedung A | A1.3 | Ruang BPH | BPH | 60 | D | 2020 |
10 | Gedung A | A1.4 | Ruang Transit | Transit dosen | 13 | D | 2020 |
11 | Gedung A | A3.1 | Laboratorium | Lab.Computer (CBT CENTER) | 180 | D | 2020 |
12 | Gedung A | A3.2 | Ruang Transit | Transit dosen | 13 | D | 2020 |
13 | GEDUNG B | B1.1A | Ruang Kuliah | PBL | 13 | D | |
14 | GEDUNG B | B1.1B | Ruang Kuliah | PBL | 13 | D | |
15 | GEDUNG B | B1.1C | Ruang Kuliah | PBL | 13 | D | |
16 | GEDUNG B | B1.2 | Perpustakaan | Perpustakaan | 140 | D | |
17 | GEDUNG B | B1.3 | Ruang Lembaga | Kepala LPMPI | 8 | D | |
18 | GEDUNG B | B1.4 | Ruang Lembaga | LPPM | 27 | D | |
19 | GEDUNG B | B1.5 | Ruang Lembaga | LPMPI | 27 | D | |
20 | GEDUNG B | B2.1 | Ruang Kuliah | Kuliah | 30 | D | |
21 | GEDUNG B | B2.2 | Ruang Kuliah | Kuliah | 30 | D | |
22 | GEDUNG B | B2.3 | Ruang Dosen | Dosen | 66 | D | |
23 | GEDUNG B | B2.4 | Ruang Kuliah | Kuliah | 57 | D | |
24 | GEDUNG B | B2.5 | Ruang Kuliah | Kuliah | 74 | D | |
25 | GEDUNG B | B2.6 | Ruang Kuliah | Kuliah | 50 | D | |
26 | GEDUNG B | B2.7 | Laboratorium | Lab.Computer | 30 | D | |
27 | GEDUNG B | B3.1 | Laboratorium | Laboratorium Terpadu | 283 | D | |
28 | GEDUNG B | B3.1A | Laboratorium | Kepala Laboratorium | 28 | D | |
29 | GEDUNG B | B3.1B | Laboratorium | Perasiapan Alat Laboratorium | 115 | D | |
30 | GEDUNG B | B3.2 | Ruang IT | IT | 40 | D |